Donatoni Macchine
Technical maintenance sheet Controlled procedure

Before proceeding, carefully read the

SAFETY INSTRUCTIONS

Intervalbased on abrasive consumption

Operation complexityLow01 / 05

Authorized personnelMachine operator

Required PPE:

image-20240327-084216.png

Procedure

  • Check that the bridge and other machine components do not come into contact with the parts being moved

  • Open the drain valve to empty the tank

    image-20260626-141452.png
  • Lift the blade frame using the dedicated supports (Frame weight = 750Kg)

    image-20260626-141252.png
  • Remove the workpiece recovery grids

  • (OPTIONAL) Lift and empty the abrasive collection tanks. Then clean them and check their integrity

    image-20260626-141642.png
  • Thoroughly clean the tank, removing abrasive residue

  • Reposition the abrasive collection tanks, grids and blade bed

;