Donatoni Macchine
Technical maintenance sheet Controlled procedure

Before proceeding, carefully read the

SAFETY INSTRUCTIONS

Intervalevery 300 working hours

Operation complexityLow01 / 05

Authorized personnelMachine operator

Required PPE:

image-20240327-084216.png

Images

image-20240327-174356.png

Procedure

At least every 300 working hours, use a suitable grease gun to grease the Z-axis ball nut bearing with 1 cm3 of grease through the grease nipple shown in the figure

The grease nipple is located on the right side of the quill, underneath the guard shown in the figure, and is positioned as indicated and highlighted in the image.

 

image-20240922-085348.png
image-20240922-085433.png

;