Donatoni Macchine
Technical maintenance sheet Controlled procedure

Before proceeding, carefully read the

SAFETY INSTRUCTIONS

Intervalevery 300 working hours

Operation complexityLow01 / 05

Authorized personnelMachine operator

Required PPE:

image-20240327-084216.png

Images

image-20240327-174356.png

Procedure

The automatic greasing system consists of an automatic unit that lubricates the connected points according to the programmed schedule.

image-20240917-101622.png

The reservoir must be topped up with the required grease without exceeding the indicated maximum level.

At least every 500 working hours, check the grease level in the reservoir and top it up when necessary using the correct type of grease

N.B. An on-screen alarm warns the operator when the grease level has reached the minimum level in the reservoir and topping up is therefore required.

Device-specific manual

;