Technical maintenance sheet Controlled procedure
Before proceeding, carefully read the | |
Intervalevery 1000 working hours | Operation complexityLow01 / 05 |
Authorized personnelMachine operator | Required PPE: ![]() |
Procedure
Position the machine in the centre of the tank. Switch on the pump and check the high-pressure pipes for leaks.
If leaks are present, switch off the pump, press the emergency stop mushroom button and eliminate the leak by tightening the fitting to the correct torque.
35 Nm for 1/4” fittings
70 Nm for 3/8” fittings
Then release the emergency stop, enable the controls and try switching the pump on again to check for any further leaks.
The HP hose diagram is available at the link below.
