Technical maintenance sheet Controlled procedure
Before proceeding, carefully read the | |
Intervalevery 1000 working hours | Operation complexityMedium03 / 05 |
Authorized personnelMachine operator | Required PPE: ![]() |
Rotate axis A to 90_ to access the closure on the head
Remove the guard

Remove the protective guard under the head
Remove the hose clamp
Pull the hose out from below, noting its routing; the new hose must be routed along the same path
Insert the new abrasive hose
Secure the hose with the dedicated fastener
Close the guards, taking care with the cables under the head
Video
